fb tracking

Used 2026 BMW M4 Coupe

Stock: 261902AVIN: WBS13HK07TCW34599

Stock: 261902A VIN: WBS13HK07TCW34599

Used 2026 BMW M4 Coupe

Detailed Pricing
Market Value:
$89,725
Bozard Ford Discount:
$6,725
Bozard Price:
$83,000
Or
Finance For: $984/mo
84 mos.
$8,300 down
2.9% APR

Vehicle Highlights

Views
341
employee pricing
Overview
261902A
Stock
WBS13HK07TCW34599
VIN
605
Miles
Coupe
Body
RWD
Drivetrain
Blue
Exterior
Black
Interior
112.5
Wheelbase
3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 473hp
Engine
Gas
Fuel
6-Speed Manual
Transmission
2
Doors
23*
Highway MPG
16*
City MPG
Description
Thank you for taking the time to look at this exceptional 2026 BMW M4 Base. ***OUR GREAT PRICE IS JUST THE BEGINNING*** This stunning vehicle features an impressive array of premium amenities, including: - WHEELS: 19" X 9.5" FR/20" X 10.5" RR FORGED BLACK - CARBON FIBER TRIM - PARKING ASSISTANCE PACKAGE with Parking View and 3D Surround View - Harman/Kardon Surround Sound System - Apple CarPlay and Android Auto Compatibility - BMW Assist ECall and BMW TeleServices - Navigation System - Parking Assistance Package - M Sport Seats - Power Front Seats - Heated Front Seats Powered by a potent 3.0L I6 Turbocharged engine delivering 473 horsepower, this M4 Base delivers exhilarating performance and an unforgettable driving experience. The 6-speed manual transmission and rear-wheel-drive configuration provide exceptional control and responsiveness, allowing you to fully harness the vehicle's impressive capabilities. Beyond its dynamic performance, this M4 also boasts a striking Tanzanite Blue II Metallic exterior, complemented by the bold and distinctive design cues that have made the M4 a true icon in the high-performance luxury segment. The attention to detail is evident in the sleek, aerodynamic lines and the purposeful, muscular stance that conveys a sense of power and refinement. Inside, the cabin is outfitted with premium materials and thoughtful features that cater to both the driver and passengers. The supportive M Sport seats, heated for added comfort, provide a commanding driving position, while the intuitive infotainment system and advanced connectivity features ensure you stay connected and entertained on every journey. Safety and convenience are also paramount, with the Parking Assistance Package and its advanced parking sensors and surround-view cameras making navigating tight spaces a breeze. The comprehensive suite of driver-assistance technologies further enhances your confidence and peace of mind behind the wheel. Whether you're seeking the ultimate driving experience or simply desire a luxurious and capable sports coupe, this 2026 BMW M4 Base is a truly exceptional offering that deserves your attention. We invite you to schedule a test drive and discover the exhilaration that awaits. Thank you for your time, and we look forward to the opportunity to assist you.
Features
Apple CarPlay

Apple CarPlay

Brake Assist

Brake Assist

Heated Seats

Heated Seats

Heated Side Mirrors

Heated Side Mirrors

Keyless Entry

Keyless Entry

Memory Seats

Memory Seats

Navigation

Navigation

Parking Assist

Parking Assist

Power Seat

Power Seat

Power Windows

Power Windows

Rain Sensing Wipers

Rain Sensing Wipers

Rearview Camera

Rearview Camera

Satellite Radio

Satellite Radio

Security System

Security System

Side-Impact Air Bags

Side-Impact Air Bags

Stability Control

Stability Control

Heated Steering Wheel

Heated Steering Wheel

Details
Features
Navigation
Connected Package Pro Limited Term
16 Speakers
AM/FM radio: SiriusXM with 360L
Audio memory
Harman/Kardon Surround Sound System
harman/kardon Speakers
Radio data system
Radio: AM/FM Audio System
SiriusXM with 360L and 1 Year Trial Subscription
Air Conditioning
Automatic temperature control
Front dual zone A/C
HVAC memory
Rear window defroster
Lumbar Support
Memory seat
Power driver seat
Power steering
Power windows
Remote keyless entry
Steering wheel mounted audio controls
Adaptive suspension
Four wheel independent suspension
Speed-sensing steering
Traction control
4-Wheel Disc Brakes
ABS brakes
Dual front impact airbags
Dual front side impact airbags
Emergency communication system: BMW Assist eCall
Front anti-roll bar
Knee airbag
Low tire pressure warning
Occupant sensing airbag
Overhead airbag
Rear anti-roll bar
Brake assist
Electronic Stability Control
Exterior Parking Camera Rear
Auto High-beam Headlights
Delay-off headlights
Fully automatic headlights
Panic alarm
Security system
Speed control
Auto-dimming door mirrors
Bumpers: body-color
Heated door mirrors
Power door mirrors
Spoiler
Turn signal indicator mirrors
Apple CarPlay and Android Auto Compatibility
Auto-dimming Rear-View mirror
BMW Assist ECall
BMW TeleServices
Compass
ConnectedDrive Services
Driver door bin
Driver vanity mirror
Front reading lights
Garage door transmitter
Heated steering wheel
Illuminated entry
Leather Shift Knob
Leather steering wheel
Outside temperature display
Overhead console
Passenger vanity mirror
Personal ESIM 5G
Rear reading lights
Rear seat center armrest
Sport steering wheel
Tachometer
Telescoping steering wheel
Tilt steering wheel
Trip computer
Widescreen Display
Front Bucket Seats
Front Center Armrest
Heated Front Seats
Heated front seats
M Sport Seats
Power Front Seats
Power passenger seat
Split folding rear seat
Passenger door bin
Alloy wheels
Wheels: 18" x 9.5" Front/19" x 10.5" Rear M Dual-Spoke
Rain sensing wipers
Speed-Sensitive Wipers
Variably intermittent wipers
Mechanical
Engine: 3.0L 6-Cylinder TwinPower Turbo
Transmission: 6-Speed Manual
Engine Auto Stop-Start Feature
Transmission w/Driver Selectable Mode
Rear-Wheel Drive
3.46 Axle Ratio
Engine Oil Cooler
Battery w/Run Down Protection
Regenerative Alternator
Gas-Pressurized Shock Absorbers
Front And Rear Anti-Roll Bars
Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
Electric Power-Assist Speed-Sensing Steering
15.6 Gal. Fuel Tank
Dual Stainless Steel Exhaust w/Chrome Tailpipe Finisher
Strut Front Suspension w/Coil Springs
Multi-Link Rear Suspension w/Coil Springs
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
Electro-Mechanical Limited Slip Differential
Exterior
Tire Mobility Kit
Body-Colored Front Bumper
Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
Rocker Panel Extensions
Black Side Windows Trim and Black Front Windshield Trim
Body-Colored Door Handles
Body-Colored Power Heated Side Mirrors w/Driver Auto Dimming, Power Folding and Turn Signal Indicator
Fixed Rear Window w/Defroster
Light Tinted Glass
Speed Sensitive Rain Detecting Variable Intermittent Wipers
Galvanized Steel/Aluminum/Composite Panels
Black Grille
Front License Plate Bracket
Power Trunk Rear Cargo Access
Auto On/Off Projector Beam Led Low/High Beam Auto-Leveling Directionally Adaptive Auto High-Beam Daytime Running Lights Preference Setting Headlamps w/Delay-Off
Cornering Lights
Perimeter/Approach Lights
LED Brakelights
Headlights-Automatic Highbeams
Entertainment
Radio: AM/FM Audio System
16 Speakers
600w Premium Amplifier
Streaming Audio
Integrated Roof Antenna
harman/kardon Surround Sound System
Bluetooth Wireless Phone Connectivity
2 LCD Monitors In The Front
Artti Real-Time Traffic Display
Interior
12-Way Driver Seat -inc: Manual Cushion Extension and Power Rear Seat Easy Entry
12-Way Passenger Seat -inc: Manual Cushion Extension and Power Rear Seat Easy Entry
40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
Manual Tilt/Telescoping Steering Column
Fixed Rear Windows
M Sport Sport Heated Leather Steering Wheel
Front Cupholder
Rear Cupholder
Compass
Valet Function
Power Fuel Flap Locking Type
Remote Releases -Inc: Comfort Access Proximity Cargo Access
Garage Door Transmitter
Cruise Control w/Steering Wheel Controls
Voice Activated Dual Zone Front Automatic Air Conditioning
HVAC -inc: Underseat Ducts and Console Ducts
Illuminated Locking Glove Box
Driver Foot Rest
Interior Trim -inc: Aluminum Instrument Panel Insert, Aluminum Console Insert and Piano Black/Metal-Look Interior Accents
Full Cloth Headliner
Leather/Metal-Look Gear Shifter Material
Day-Night Auto-Dimming Rearview Mirror
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination, Driver And Passenger Auxiliary Mirror
Full Floor Console w/Covered Storage, Mini Overhead Console and 3 12V DC Power Outlets
Front And Rear Map Lights
Fade-To-Off Interior Lighting
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
Trunk/Hatch Auto-Latch
Cargo Area Concealed Storage
Cargo Features -inc: Tire Mobility Kit
Cargo Space Lights
Memory Settings -inc: Driver Seat, Door Mirrors, Audio and HVAC
Tracker System
Widescreen Display
Instrument Panel Covered Bin, Driver And Passenger Door Bins
Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down
Delayed Accessory Power
Driver Information Center
Redundant Digital Speedometer
Outside Temp Gauge
Digital Appearance
BMW TeleServices
Manual Adjustable Front Head Restraints and Fixed Rear Head Restraints
Front Center Armrest and Rear Center Armrest
Perimeter Alarm
Immobilizer
3 12V DC Power Outlets
Air Filtration
Safety
Side Impact Beams
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Active Blind Spot Detection Blind Spot
Frontal Collision Warning
Rear Collision Prevention
Collision Mitigation-Front
Driver Monitoring-Alert
Tire Specific Low Tire Pressure Warning
Dual Stage Driver And Passenger Front Airbags
Curtain 1st And 2nd Row Airbags
Airbag Occupancy Sensor
Driver And Passenger Knee Airbag
Outboard Front Lap And Shoulder Safety Belts -inc: Pretensioners
Back-Up Camera
Similar Vehicles

2023 BMW 4 Series 430i

Stock: 261196AA

Quick View

2021 BMW 5 Series 530i

Stock: P10046

Quick View

2022 BMW 7 Series 740i

Stock: 261003A

Quick View

2020 Ford Mustang GT Premium

Stock: P10074

Quick View

Dealer FAQs

Can I get financed for an auto loan at Bozard Ford?

Getting financed with us is fast and fun. Whether you’ve always enjoyed a sterling credit history, are currently working on improving your credit score even more, or this is your first time buying a car, you can count on the friendly experts at Bozard Ford to make the whole process transparent and easy to understand. To learn more and get the ball rolling on the right loan for your unique financial situation, call 904-441-6152 or apply online now.

What is the financing process like at Bozard Ford?

Easy and relaxed. Our primary goal is your total satisfaction, so we provide you with as much time and expert insight as you need to properly consider all of your loan options. This commitment to friendly, honest, and fair service is truly a breath of fresh air and ensures that you drive away happy, satisfied, and behind the wheel of the vehicle you've always wanted.

What are the steps in the financing process at Bozard Ford?

Great question. Securing a competitive loan from Bozard Ford takes only three easy steps. First up is to either apply online for pre-approval via our quick and convenient online credit application or call 904-441-6152. From here, one of our financing experts will connect with you to go over the details of your loan offers and ensure that you have everything you need to make a smart and informed decision.

After reviewing your proposed loan terms and consulting with our financial advisors and your trusted personal confidants (friends, family members, etc.), there is only one step left: Finalizing the perfect loan for you via a simple and respectful process. By following these three short steps, you can make the most of the best loan experience here in Jacksonville.

What is involved in securing an auto loan in Jacksonville FL?

The answer to this question includes a variety of factors, such as:

  • Your car's purchase price
  • Your trade in and equity position
  • If the vehicle you are purchasing is new or used
  • The length of your existing loan's life
  • Your current credit score
  • How much you are choosing to invest in a down payment

People from all around Jacksonville come to purchase a clean car, truck, or SUV from our used car lot each and every day. Most loans prepared by our team are entirely unique, so the factors that will shape your bank loan will depend on your specific situation, desires, and needs.

Our expert financial professionals are happy to find and present lots of great offers to ensure that you are in complete control and that you are receiving the best deal possible on the loan you need. Our customers make great and informed decisions based on all of their available options thanks to a perfectly transparent process that we take seriously.

Who can I call at Bozard Ford to get the financing process started?

Any of our amazing specialists will be more than happy to help you get the ball rolling on your dream car. All you have to do is dial 904-441-6152 when you have a few free moments and you'll soon see that getting approved for a car loan at Bozard Ford is quick, easy, and convenient.

1 - Shopping at Bozard Ford Lincoln has been known to create intense feelings of joy and satisfaction. Sudden outbursts of laughter are not uncommon. As you probably know, the quoted internet price on any new Ford vehicle may include Ford rebates (and/or) incentives and may require Ford Credit financing (and/or) the trade of a qualifying vehicle. Not all buyers will qualify for Ford Credit financing. Special financing from Ford Credit may be offered in lieu of the Ford rebates included in new vehicle advertised price. Residency restrictions may apply. For all offers, take new retail delivery from dealer stock. See dealer for qualifications and complete details. While every reasonable effort is made to ensure the accuracy of this information, we are not responsible for any errors or emissions, including price, contained within these pages. Price subject to change. Some vehicles may have equipment / accessories added to them that may not be reflected in the advertised price. All prices are before tax, tag, title, and $899.00 fee. No tricks here, just great people who want to EARN your business. See Dealer for details.

2 - This site, and all information and materials appearing on it, are presented to the user "as is" without warranty of any kind, either express or implied. All vehicles are subject to prior sale.

3 - EPA mileage estimates are for newly manufactured vehicles only. Your actual mileage will vary depending on how you drive and maintain your vehicle.

4 - See Dealer for Certified Pre-Owned limited warranty coverage details. CARFAX® is a registered trademark of CARFAX®, Inc.

5 - Home Delivery: Bozard will deliver up to 50 miles free of charge. Deliveries beyond 50 miles will be subject to a non-refundable delivery fee which will equate to $1.29 for each mile over 50. The fee is calculated based on a one-way trip from Bozard to the customer’s home. Contact dealer for complete qualifications and details.

6 - Money Back Guarantee & Vehicle Exchange Offer: Exclusions may apply. Amount of miles put on vehicle may not exceed 250. Limited to one exchange per vehicle purchase. Contact dealer for complete qualifications and details.

7 - Please be advised that the vehicle currently available for purchase at our dealership may be priced above the manufacturer's suggested retail price (MSRP) due to upgrades and modifications that have been made to enhance its performance, style, and value.